World Journal of Engineering and Technology
Study of Factors Causing Time and Cost Overrun in Pre-Construction Project (A Case Study of Malaysia)
author_sort ilyas, muhammad
spelling Ilyas, Muhammad Li, Jing Ullah, Irfan 2331-4222 2331-4249 Scientific Research Publishing, Inc. http://dx.doi.org/10.4236/wjet.2020.81001 Study of Factors Causing Time and Cost Overrun in Pre-Construction Project (A Case Study of Malaysia) World Journal of Engineering and Technology
doi_str_mv 10.4236/wjet.2020.81001
facet_avail Online
Free
format ElectronicArticle
fullrecord blob:ai-49-aHR0cDovL2R4LmRvaS5vcmcvMTAuNDIzNi93amV0LjIwMjAuODEwMDE
id ai-49-aHR0cDovL2R4LmRvaS5vcmcvMTAuNDIzNi93amV0LjIwMjAuODEwMDE
institution DE-D275
DE-Bn3
DE-Brt1
DE-Zwi2
DE-D161
DE-Gla1
DE-Zi4
DE-15
DE-Pl11
DE-Rs1
DE-105
DE-14
DE-Ch1
DE-L229
imprint Scientific Research Publishing, Inc., 2020
imprint_str_mv Scientific Research Publishing, Inc., 2020
issn 2331-4222
2331-4249
issn_str_mv 2331-4222
2331-4249
language Undetermined
mega_collection Scientific Research Publishing, Inc. (CrossRef)
match_str ilyas2020studyoffactorscausingtimeandcostoverruninpreconstructionprojectacasestudyofmalaysia
publishDateSort 2020
publisher Scientific Research Publishing, Inc.
recordtype ai
record_format ai
series World Journal of Engineering and Technology
source_id 49
title Study of Factors Causing Time and Cost Overrun in Pre-Construction Project (A Case Study of Malaysia)
title_unstemmed Study of Factors Causing Time and Cost Overrun in Pre-Construction Project (A Case Study of Malaysia)
title_full Study of Factors Causing Time and Cost Overrun in Pre-Construction Project (A Case Study of Malaysia)
title_fullStr Study of Factors Causing Time and Cost Overrun in Pre-Construction Project (A Case Study of Malaysia)
title_full_unstemmed Study of Factors Causing Time and Cost Overrun in Pre-Construction Project (A Case Study of Malaysia)
title_short Study of Factors Causing Time and Cost Overrun in Pre-Construction Project (A Case Study of Malaysia)
title_sort study of factors causing time and cost overrun in pre-construction project (a case study of malaysia)
url http://dx.doi.org/10.4236/wjet.2020.81001
publishDate 2020
physical 1-12
description
container_issue 1
container_start_page 1
container_title World Journal of Engineering and Technology
container_volume 8
format_de105 Article, E-Article
format_de14 Article, E-Article
format_de15 Article, E-Article
format_de520 Article, E-Article
format_de540 Article, E-Article
format_dech1 Article, E-Article
format_ded117 Article, E-Article
format_degla1 E-Article
format_del152 Buch
format_del189 Article, E-Article
format_dezi4 Article
format_dezwi2 Article, E-Article
format_finc Article, E-Article
format_nrw Article, E-Article
_version_ 1792333124310401027
geogr_code not assigned
last_indexed 2024-03-01T14:07:45.873Z
geogr_code_person not assigned
openURL url_ver=Z39.88-2004&ctx_ver=Z39.88-2004&ctx_enc=info%3Aofi%2Fenc%3AUTF-8&rfr_id=info%3Asid%2Fvufind.svn.sourceforge.net%3Agenerator&rft.title=Study+of+Factors+Causing+Time+and+Cost+Overrun+in+Pre-Construction+Project++%28A+Case+Study+of+Malaysia%29&rft.date=2020-01-01&genre=article&issn=2331-4249&volume=8&issue=1&spage=1&epage=12&pages=1-12&jtitle=World+Journal+of+Engineering+and+Technology&atitle=Study+of+Factors+Causing+Time+and+Cost+Overrun+in+Pre-Construction+Project++%28A+Case+Study+of+Malaysia%29&aulast=Ullah&aufirst=Irfan&rft_id=info%3Adoi%2F10.4236%2Fwjet.2020.81001&rft.language%5B0%5D=und
SOLR
_version_ 1792333124310401027
author Ilyas, Muhammad, Li, Jing, Ullah, Irfan
author_facet Ilyas, Muhammad, Li, Jing, Ullah, Irfan, Ilyas, Muhammad, Li, Jing, Ullah, Irfan
author_sort ilyas, muhammad
container_issue 1
container_start_page 1
container_title World Journal of Engineering and Technology
container_volume 8
description
doi_str_mv 10.4236/wjet.2020.81001
facet_avail Online, Free
format ElectronicArticle
format_de105 Article, E-Article
format_de14 Article, E-Article
format_de15 Article, E-Article
format_de520 Article, E-Article
format_de540 Article, E-Article
format_dech1 Article, E-Article
format_ded117 Article, E-Article
format_degla1 E-Article
format_del152 Buch
format_del189 Article, E-Article
format_dezi4 Article
format_dezwi2 Article, E-Article
format_finc Article, E-Article
format_nrw Article, E-Article
geogr_code not assigned
geogr_code_person not assigned
id ai-49-aHR0cDovL2R4LmRvaS5vcmcvMTAuNDIzNi93amV0LjIwMjAuODEwMDE
imprint Scientific Research Publishing, Inc., 2020
imprint_str_mv Scientific Research Publishing, Inc., 2020
institution DE-D275, DE-Bn3, DE-Brt1, DE-Zwi2, DE-D161, DE-Gla1, DE-Zi4, DE-15, DE-Pl11, DE-Rs1, DE-105, DE-14, DE-Ch1, DE-L229
issn 2331-4222, 2331-4249
issn_str_mv 2331-4222, 2331-4249
language Undetermined
last_indexed 2024-03-01T14:07:45.873Z
match_str ilyas2020studyoffactorscausingtimeandcostoverruninpreconstructionprojectacasestudyofmalaysia
mega_collection Scientific Research Publishing, Inc. (CrossRef)
physical 1-12
publishDate 2020
publishDateSort 2020
publisher Scientific Research Publishing, Inc.
record_format ai
recordtype ai
series World Journal of Engineering and Technology
source_id 49
spelling Ilyas, Muhammad Li, Jing Ullah, Irfan 2331-4222 2331-4249 Scientific Research Publishing, Inc. http://dx.doi.org/10.4236/wjet.2020.81001 Study of Factors Causing Time and Cost Overrun in Pre-Construction Project (A Case Study of Malaysia) World Journal of Engineering and Technology
spellingShingle Ilyas, Muhammad, Li, Jing, Ullah, Irfan, World Journal of Engineering and Technology, Study of Factors Causing Time and Cost Overrun in Pre-Construction Project (A Case Study of Malaysia)
title Study of Factors Causing Time and Cost Overrun in Pre-Construction Project (A Case Study of Malaysia)
title_full Study of Factors Causing Time and Cost Overrun in Pre-Construction Project (A Case Study of Malaysia)
title_fullStr Study of Factors Causing Time and Cost Overrun in Pre-Construction Project (A Case Study of Malaysia)
title_full_unstemmed Study of Factors Causing Time and Cost Overrun in Pre-Construction Project (A Case Study of Malaysia)
title_short Study of Factors Causing Time and Cost Overrun in Pre-Construction Project (A Case Study of Malaysia)
title_sort study of factors causing time and cost overrun in pre-construction project (a case study of malaysia)
title_unstemmed Study of Factors Causing Time and Cost Overrun in Pre-Construction Project (A Case Study of Malaysia)
url http://dx.doi.org/10.4236/wjet.2020.81001