Eintrag weiter verarbeiten
Based on Industrial Engineering Production System Analysis and Improvement Research
Gespeichert in:
Zeitschriftentitel: | Advanced Materials Research |
---|---|
Personen und Körperschaften: | |
In: | Advanced Materials Research, 542-543, 2012, S. 320-323 |
Format: | E-Article |
Sprache: | Unbestimmt |
veröffentlicht: |
Trans Tech Publications, Ltd.
|
Schlagwörter: |
author_facet |
Zhao, Ling Zhao, Ling |
---|---|
author |
Zhao, Ling |
spellingShingle |
Zhao, Ling Advanced Materials Research Based on Industrial Engineering Production System Analysis and Improvement Research General Engineering |
author_sort |
zhao, ling |
spelling |
Zhao, Ling 1662-8985 Trans Tech Publications, Ltd. General Engineering http://dx.doi.org/10.4028/www.scientific.net/amr.542-543.320 <jats:p>The paper is focus on the assembly line of the factory .The nodular method and second-watch measuring methods are applied to measure the work time of the bottleneck stations. To improve the cycle time of the assembly line, the work contents of relative stations is reallocated. Finally, the production line is disposed again on the basis of the principle of ECRS and the line balancing theory .After implemented the new method, the capability of this production line has improved.</jats:p> Based on Industrial Engineering Production System Analysis and Improvement Research Advanced Materials Research |
doi_str_mv |
10.4028/www.scientific.net/amr.542-543.320 |
facet_avail |
Online |
format |
ElectronicArticle |
fullrecord |
blob:ai-49-aHR0cDovL2R4LmRvaS5vcmcvMTAuNDAyOC93d3cuc2NpZW50aWZpYy5uZXQvYW1yLjU0Mi01NDMuMzIw |
id |
ai-49-aHR0cDovL2R4LmRvaS5vcmcvMTAuNDAyOC93d3cuc2NpZW50aWZpYy5uZXQvYW1yLjU0Mi01NDMuMzIw |
institution |
DE-D275 DE-Bn3 DE-Brt1 DE-D161 DE-Gla1 DE-Zi4 DE-15 DE-Pl11 DE-Rs1 DE-105 DE-14 DE-Ch1 DE-L229 |
imprint |
Trans Tech Publications, Ltd., 2012 |
imprint_str_mv |
Trans Tech Publications, Ltd., 2012 |
issn |
1662-8985 |
issn_str_mv |
1662-8985 |
language |
Undetermined |
mega_collection |
Trans Tech Publications, Ltd. (CrossRef) |
match_str |
zhao2012basedonindustrialengineeringproductionsystemanalysisandimprovementresearch |
publishDateSort |
2012 |
publisher |
Trans Tech Publications, Ltd. |
recordtype |
ai |
record_format |
ai |
series |
Advanced Materials Research |
source_id |
49 |
title |
Based on Industrial Engineering Production System Analysis and Improvement Research |
title_unstemmed |
Based on Industrial Engineering Production System Analysis and Improvement Research |
title_full |
Based on Industrial Engineering Production System Analysis and Improvement Research |
title_fullStr |
Based on Industrial Engineering Production System Analysis and Improvement Research |
title_full_unstemmed |
Based on Industrial Engineering Production System Analysis and Improvement Research |
title_short |
Based on Industrial Engineering Production System Analysis and Improvement Research |
title_sort |
based on industrial engineering production system analysis and improvement research |
topic |
General Engineering |
url |
http://dx.doi.org/10.4028/www.scientific.net/amr.542-543.320 |
publishDate |
2012 |
physical |
320-323 |
description |
<jats:p>The paper is focus on the assembly line of the factory .The nodular method and second-watch measuring methods are applied to measure the work time of the bottleneck stations. To improve the cycle time of the assembly line, the work contents of relative stations is reallocated. Finally, the production line is disposed again on the basis of the principle of ECRS and the line balancing theory .After implemented the new method, the capability of this production line has improved.</jats:p> |
container_start_page |
320 |
container_title |
Advanced Materials Research |
container_volume |
542-543 |
format_de105 |
Article, E-Article |
format_de14 |
Article, E-Article |
format_de15 |
Article, E-Article |
format_de520 |
Article, E-Article |
format_de540 |
Article, E-Article |
format_dech1 |
Article, E-Article |
format_ded117 |
Article, E-Article |
format_degla1 |
E-Article |
format_del152 |
Buch |
format_del189 |
Article, E-Article |
format_dezi4 |
Article |
format_dezwi2 |
Article, E-Article |
format_finc |
Article, E-Article |
format_nrw |
Article, E-Article |
_version_ |
1792324441000116227 |
geogr_code |
not assigned |
last_indexed |
2024-03-01T11:49:45.076Z |
geogr_code_person |
not assigned |
openURL |
url_ver=Z39.88-2004&ctx_ver=Z39.88-2004&ctx_enc=info%3Aofi%2Fenc%3AUTF-8&rfr_id=info%3Asid%2Fvufind.svn.sourceforge.net%3Agenerator&rft.title=Based+on+Industrial+Engineering+Production+System+Analysis+and+Improvement+Research&rft.date=2012-06-01&genre=article&issn=1662-8985&volume=542-543&spage=320&epage=323&pages=320-323&jtitle=Advanced+Materials+Research&atitle=Based+on+Industrial+Engineering+Production+System+Analysis+and+Improvement+Research&aulast=Zhao&aufirst=Ling&rft_id=info%3Adoi%2F10.4028%2Fwww.scientific.net%2Famr.542-543.320&rft.language%5B0%5D=und |
SOLR | |
_version_ | 1792324441000116227 |
author | Zhao, Ling |
author_facet | Zhao, Ling, Zhao, Ling |
author_sort | zhao, ling |
container_start_page | 320 |
container_title | Advanced Materials Research |
container_volume | 542-543 |
description | <jats:p>The paper is focus on the assembly line of the factory .The nodular method and second-watch measuring methods are applied to measure the work time of the bottleneck stations. To improve the cycle time of the assembly line, the work contents of relative stations is reallocated. Finally, the production line is disposed again on the basis of the principle of ECRS and the line balancing theory .After implemented the new method, the capability of this production line has improved.</jats:p> |
doi_str_mv | 10.4028/www.scientific.net/amr.542-543.320 |
facet_avail | Online |
format | ElectronicArticle |
format_de105 | Article, E-Article |
format_de14 | Article, E-Article |
format_de15 | Article, E-Article |
format_de520 | Article, E-Article |
format_de540 | Article, E-Article |
format_dech1 | Article, E-Article |
format_ded117 | Article, E-Article |
format_degla1 | E-Article |
format_del152 | Buch |
format_del189 | Article, E-Article |
format_dezi4 | Article |
format_dezwi2 | Article, E-Article |
format_finc | Article, E-Article |
format_nrw | Article, E-Article |
geogr_code | not assigned |
geogr_code_person | not assigned |
id | ai-49-aHR0cDovL2R4LmRvaS5vcmcvMTAuNDAyOC93d3cuc2NpZW50aWZpYy5uZXQvYW1yLjU0Mi01NDMuMzIw |
imprint | Trans Tech Publications, Ltd., 2012 |
imprint_str_mv | Trans Tech Publications, Ltd., 2012 |
institution | DE-D275, DE-Bn3, DE-Brt1, DE-D161, DE-Gla1, DE-Zi4, DE-15, DE-Pl11, DE-Rs1, DE-105, DE-14, DE-Ch1, DE-L229 |
issn | 1662-8985 |
issn_str_mv | 1662-8985 |
language | Undetermined |
last_indexed | 2024-03-01T11:49:45.076Z |
match_str | zhao2012basedonindustrialengineeringproductionsystemanalysisandimprovementresearch |
mega_collection | Trans Tech Publications, Ltd. (CrossRef) |
physical | 320-323 |
publishDate | 2012 |
publishDateSort | 2012 |
publisher | Trans Tech Publications, Ltd. |
record_format | ai |
recordtype | ai |
series | Advanced Materials Research |
source_id | 49 |
spelling | Zhao, Ling 1662-8985 Trans Tech Publications, Ltd. General Engineering http://dx.doi.org/10.4028/www.scientific.net/amr.542-543.320 <jats:p>The paper is focus on the assembly line of the factory .The nodular method and second-watch measuring methods are applied to measure the work time of the bottleneck stations. To improve the cycle time of the assembly line, the work contents of relative stations is reallocated. Finally, the production line is disposed again on the basis of the principle of ECRS and the line balancing theory .After implemented the new method, the capability of this production line has improved.</jats:p> Based on Industrial Engineering Production System Analysis and Improvement Research Advanced Materials Research |
spellingShingle | Zhao, Ling, Advanced Materials Research, Based on Industrial Engineering Production System Analysis and Improvement Research, General Engineering |
title | Based on Industrial Engineering Production System Analysis and Improvement Research |
title_full | Based on Industrial Engineering Production System Analysis and Improvement Research |
title_fullStr | Based on Industrial Engineering Production System Analysis and Improvement Research |
title_full_unstemmed | Based on Industrial Engineering Production System Analysis and Improvement Research |
title_short | Based on Industrial Engineering Production System Analysis and Improvement Research |
title_sort | based on industrial engineering production system analysis and improvement research |
title_unstemmed | Based on Industrial Engineering Production System Analysis and Improvement Research |
topic | General Engineering |
url | http://dx.doi.org/10.4028/www.scientific.net/amr.542-543.320 |