author_facet Świder, Piotr
Kozanecki Jr, Zbigniew
Graczykowski, Marek
Kryłłowicz, Władysław
Świder, Piotr
Kozanecki Jr, Zbigniew
Graczykowski, Marek
Kryłłowicz, Władysław
author Świder, Piotr
Kozanecki Jr, Zbigniew
Graczykowski, Marek
Kryłłowicz, Władysław
spellingShingle Świder, Piotr
Kozanecki Jr, Zbigniew
Graczykowski, Marek
Kryłłowicz, Władysław
Open Engineering
Technical aspects of a large size industrial process turbo compressor revamp
Electrical and Electronic Engineering
Mechanical Engineering
Aerospace Engineering
General Materials Science
Civil and Structural Engineering
Environmental Engineering
author_sort świder, piotr
spelling Świder, Piotr Kozanecki Jr, Zbigniew Graczykowski, Marek Kryłłowicz, Władysław 2391-5439 Walter de Gruyter GmbH Electrical and Electronic Engineering Mechanical Engineering Aerospace Engineering General Materials Science Civil and Structural Engineering Environmental Engineering http://dx.doi.org/10.1515/eng-2015-0048 <jats:title>Abstract</jats:title><jats:p>This paper describes several modernization aspects of the process 8 MW air compressor and its driver. The main aim of the revamp was to increase internal efficiencies of both the compressor and turbine and increase the load of the compressor without additional power consumption. The original pressure ratio was preserved. To meet these requirements a redesign of the flow path of both machineswas necessary.Moreover, the turbineworking conditions were changed from extraction-condensing to condensing. In terms of compressor, impeller blade redesign, adaptation of diffusers and Abradable seals were a part of the scope. The revamp was completed in April 2014 with all the requirements met. This paper covers the general outline and a comparison of the original and modernized machine operating parameters, design and technical assumptions and also describes some problematic issues which occurred during the realization of the project.</jats:p> Technical aspects of a large size industrial process turbo compressor revamp Open Engineering
doi_str_mv 10.1515/eng-2015-0048
facet_avail Online
Free
finc_class_facet Geographie
Biologie
Technik
Mathematik
Physik
format ElectronicArticle
fullrecord blob:ai-49-aHR0cDovL2R4LmRvaS5vcmcvMTAuMTUxNS9lbmctMjAxNS0wMDQ4
id ai-49-aHR0cDovL2R4LmRvaS5vcmcvMTAuMTUxNS9lbmctMjAxNS0wMDQ4
institution DE-Zwi2
DE-D161
DE-Gla1
DE-Zi4
DE-15
DE-Pl11
DE-Rs1
DE-105
DE-14
DE-Ch1
DE-L229
DE-D275
DE-Bn3
DE-Brt1
imprint Walter de Gruyter GmbH, 2015
imprint_str_mv Walter de Gruyter GmbH, 2015
issn 2391-5439
issn_str_mv 2391-5439
language Undetermined
mega_collection Walter de Gruyter GmbH (CrossRef)
match_str swider2015technicalaspectsofalargesizeindustrialprocessturbocompressorrevamp
publishDateSort 2015
publisher Walter de Gruyter GmbH
recordtype ai
record_format ai
series Open Engineering
source_id 49
title Technical aspects of a large size industrial process turbo compressor revamp
title_unstemmed Technical aspects of a large size industrial process turbo compressor revamp
title_full Technical aspects of a large size industrial process turbo compressor revamp
title_fullStr Technical aspects of a large size industrial process turbo compressor revamp
title_full_unstemmed Technical aspects of a large size industrial process turbo compressor revamp
title_short Technical aspects of a large size industrial process turbo compressor revamp
title_sort technical aspects of a large size industrial process turbo compressor revamp
topic Electrical and Electronic Engineering
Mechanical Engineering
Aerospace Engineering
General Materials Science
Civil and Structural Engineering
Environmental Engineering
url http://dx.doi.org/10.1515/eng-2015-0048
publishDate 2015
physical
description <jats:title>Abstract</jats:title><jats:p>This paper describes several modernization aspects of the process 8 MW air compressor and its driver. The main aim of the revamp was to increase internal efficiencies of both the compressor and turbine and increase the load of the compressor without additional power consumption. The original pressure ratio was preserved. To meet these requirements a redesign of the flow path of both machineswas necessary.Moreover, the turbineworking conditions were changed from extraction-condensing to condensing. In terms of compressor, impeller blade redesign, adaptation of diffusers and Abradable seals were a part of the scope. The revamp was completed in April 2014 with all the requirements met. This paper covers the general outline and a comparison of the original and modernized machine operating parameters, design and technical assumptions and also describes some problematic issues which occurred during the realization of the project.</jats:p>
container_issue 1
container_start_page 0
container_title Open Engineering
container_volume 5
format_de105 Article, E-Article
format_de14 Article, E-Article
format_de15 Article, E-Article
format_de520 Article, E-Article
format_de540 Article, E-Article
format_dech1 Article, E-Article
format_ded117 Article, E-Article
format_degla1 E-Article
format_del152 Buch
format_del189 Article, E-Article
format_dezi4 Article
format_dezwi2 Article, E-Article
format_finc Article, E-Article
format_nrw Article, E-Article
_version_ 1792322521843892233
geogr_code not assigned
last_indexed 2024-03-01T11:19:13.143Z
geogr_code_person not assigned
openURL url_ver=Z39.88-2004&ctx_ver=Z39.88-2004&ctx_enc=info%3Aofi%2Fenc%3AUTF-8&rfr_id=info%3Asid%2Fvufind.svn.sourceforge.net%3Agenerator&rft.title=Technical+aspects+of+a+large+size+industrial+process+turbo+compressor+revamp&rft.date=2015-01-04&genre=article&issn=2391-5439&volume=5&issue=1&jtitle=Open+Engineering&atitle=Technical+aspects+of+a+large+size+industrial+process+turbo+compressor+revamp&aulast=Kry%C5%82%C5%82owicz&aufirst=W%C5%82adys%C5%82aw&rft_id=info%3Adoi%2F10.1515%2Feng-2015-0048&rft.language%5B0%5D=und
SOLR
_version_ 1792322521843892233
author Świder, Piotr, Kozanecki Jr, Zbigniew, Graczykowski, Marek, Kryłłowicz, Władysław
author_facet Świder, Piotr, Kozanecki Jr, Zbigniew, Graczykowski, Marek, Kryłłowicz, Władysław, Świder, Piotr, Kozanecki Jr, Zbigniew, Graczykowski, Marek, Kryłłowicz, Władysław
author_sort świder, piotr
container_issue 1
container_start_page 0
container_title Open Engineering
container_volume 5
description <jats:title>Abstract</jats:title><jats:p>This paper describes several modernization aspects of the process 8 MW air compressor and its driver. The main aim of the revamp was to increase internal efficiencies of both the compressor and turbine and increase the load of the compressor without additional power consumption. The original pressure ratio was preserved. To meet these requirements a redesign of the flow path of both machineswas necessary.Moreover, the turbineworking conditions were changed from extraction-condensing to condensing. In terms of compressor, impeller blade redesign, adaptation of diffusers and Abradable seals were a part of the scope. The revamp was completed in April 2014 with all the requirements met. This paper covers the general outline and a comparison of the original and modernized machine operating parameters, design and technical assumptions and also describes some problematic issues which occurred during the realization of the project.</jats:p>
doi_str_mv 10.1515/eng-2015-0048
facet_avail Online, Free
finc_class_facet Geographie, Biologie, Technik, Mathematik, Physik
format ElectronicArticle
format_de105 Article, E-Article
format_de14 Article, E-Article
format_de15 Article, E-Article
format_de520 Article, E-Article
format_de540 Article, E-Article
format_dech1 Article, E-Article
format_ded117 Article, E-Article
format_degla1 E-Article
format_del152 Buch
format_del189 Article, E-Article
format_dezi4 Article
format_dezwi2 Article, E-Article
format_finc Article, E-Article
format_nrw Article, E-Article
geogr_code not assigned
geogr_code_person not assigned
id ai-49-aHR0cDovL2R4LmRvaS5vcmcvMTAuMTUxNS9lbmctMjAxNS0wMDQ4
imprint Walter de Gruyter GmbH, 2015
imprint_str_mv Walter de Gruyter GmbH, 2015
institution DE-Zwi2, DE-D161, DE-Gla1, DE-Zi4, DE-15, DE-Pl11, DE-Rs1, DE-105, DE-14, DE-Ch1, DE-L229, DE-D275, DE-Bn3, DE-Brt1
issn 2391-5439
issn_str_mv 2391-5439
language Undetermined
last_indexed 2024-03-01T11:19:13.143Z
match_str swider2015technicalaspectsofalargesizeindustrialprocessturbocompressorrevamp
mega_collection Walter de Gruyter GmbH (CrossRef)
physical
publishDate 2015
publishDateSort 2015
publisher Walter de Gruyter GmbH
record_format ai
recordtype ai
series Open Engineering
source_id 49
spelling Świder, Piotr Kozanecki Jr, Zbigniew Graczykowski, Marek Kryłłowicz, Władysław 2391-5439 Walter de Gruyter GmbH Electrical and Electronic Engineering Mechanical Engineering Aerospace Engineering General Materials Science Civil and Structural Engineering Environmental Engineering http://dx.doi.org/10.1515/eng-2015-0048 <jats:title>Abstract</jats:title><jats:p>This paper describes several modernization aspects of the process 8 MW air compressor and its driver. The main aim of the revamp was to increase internal efficiencies of both the compressor and turbine and increase the load of the compressor without additional power consumption. The original pressure ratio was preserved. To meet these requirements a redesign of the flow path of both machineswas necessary.Moreover, the turbineworking conditions were changed from extraction-condensing to condensing. In terms of compressor, impeller blade redesign, adaptation of diffusers and Abradable seals were a part of the scope. The revamp was completed in April 2014 with all the requirements met. This paper covers the general outline and a comparison of the original and modernized machine operating parameters, design and technical assumptions and also describes some problematic issues which occurred during the realization of the project.</jats:p> Technical aspects of a large size industrial process turbo compressor revamp Open Engineering
spellingShingle Świder, Piotr, Kozanecki Jr, Zbigniew, Graczykowski, Marek, Kryłłowicz, Władysław, Open Engineering, Technical aspects of a large size industrial process turbo compressor revamp, Electrical and Electronic Engineering, Mechanical Engineering, Aerospace Engineering, General Materials Science, Civil and Structural Engineering, Environmental Engineering
title Technical aspects of a large size industrial process turbo compressor revamp
title_full Technical aspects of a large size industrial process turbo compressor revamp
title_fullStr Technical aspects of a large size industrial process turbo compressor revamp
title_full_unstemmed Technical aspects of a large size industrial process turbo compressor revamp
title_short Technical aspects of a large size industrial process turbo compressor revamp
title_sort technical aspects of a large size industrial process turbo compressor revamp
title_unstemmed Technical aspects of a large size industrial process turbo compressor revamp
topic Electrical and Electronic Engineering, Mechanical Engineering, Aerospace Engineering, General Materials Science, Civil and Structural Engineering, Environmental Engineering
url http://dx.doi.org/10.1515/eng-2015-0048