Eintrag weiter verarbeiten
Constructing uncertainty budget for a two-dimensional hydraulic model
Gespeichert in:
Zeitschriftentitel: | IOP Conference Series: Materials Science and Engineering |
---|---|
Personen und Körperschaften: | , |
In: | IOP Conference Series: Materials Science and Engineering, 615, 2019, 1, S. 012059 |
Format: | E-Article |
Sprache: | Unbestimmt |
veröffentlicht: |
IOP Publishing
|
author_facet |
Ozbey, N Gül, U S Ozbey, N Gül, U S |
---|---|
author |
Ozbey, N Gül, U S |
spellingShingle |
Ozbey, N Gül, U S IOP Conference Series: Materials Science and Engineering Constructing uncertainty budget for a two-dimensional hydraulic model |
author_sort |
ozbey, n |
spelling |
Ozbey, N Gül, U S 1757-8981 1757-899X IOP Publishing http://dx.doi.org/10.1088/1757-899x/615/1/012059 <jats:title>Abstract</jats:title> <jats:p>In this study the combined uncertainty of a two-dimensional (2D) hydraulic model expanded at 95% confidence level is estimated and the uncertainty budget for the model outputs is attempted to be constructed. It has been shown that many uncertainty sources in the inputs as well as the procedure applied have a significant impact on the accuracy of two-dimensional hydraulic modelling: the uncertainties in the model inputs due to variations in Manning’s ‘n’ Coefficient assigned, the bridge modelling methods, the equation sets; Diffusion Wave and Full Momentum Equations employed and the geometric data sets for the same river system in the Black Sea Region of Turkey are assessed. To estimate an appropriate M‘n’C and other model inputs of model for a river system with a wide 2D flow area is a daunting task. Therefore, any attempt to quantify uncertainties in the assigned values must be based on the samples large enough to obtain statistically significant results. To achieve this task, Monte Carlo Method is utilized to estimate the contribution of the likely variations of model inputs onto ‘the combined expended uncertainty at 95% confidence level in two-dimensional hydraulic modelling’.</jats:p> Constructing uncertainty budget for a two-dimensional hydraulic model IOP Conference Series: Materials Science and Engineering |
doi_str_mv |
10.1088/1757-899x/615/1/012059 |
facet_avail |
Online Free |
format |
ElectronicArticle |
fullrecord |
blob:ai-49-aHR0cDovL2R4LmRvaS5vcmcvMTAuMTA4OC8xNzU3LTg5OXgvNjE1LzEvMDEyMDU5 |
id |
ai-49-aHR0cDovL2R4LmRvaS5vcmcvMTAuMTA4OC8xNzU3LTg5OXgvNjE1LzEvMDEyMDU5 |
institution |
DE-Bn3 DE-Brt1 DE-Zwi2 DE-D161 DE-Gla1 DE-Zi4 DE-15 DE-Pl11 DE-Rs1 DE-105 DE-14 DE-Ch1 DE-L229 DE-D275 |
imprint |
IOP Publishing, 2019 |
imprint_str_mv |
IOP Publishing, 2019 |
issn |
1757-8981 1757-899X |
issn_str_mv |
1757-8981 1757-899X |
language |
Undetermined |
mega_collection |
IOP Publishing (CrossRef) |
match_str |
ozbey2019constructinguncertaintybudgetforatwodimensionalhydraulicmodel |
publishDateSort |
2019 |
publisher |
IOP Publishing |
recordtype |
ai |
record_format |
ai |
series |
IOP Conference Series: Materials Science and Engineering |
source_id |
49 |
title |
Constructing uncertainty budget for a two-dimensional hydraulic model |
title_unstemmed |
Constructing uncertainty budget for a two-dimensional hydraulic model |
title_full |
Constructing uncertainty budget for a two-dimensional hydraulic model |
title_fullStr |
Constructing uncertainty budget for a two-dimensional hydraulic model |
title_full_unstemmed |
Constructing uncertainty budget for a two-dimensional hydraulic model |
title_short |
Constructing uncertainty budget for a two-dimensional hydraulic model |
title_sort |
constructing uncertainty budget for a two-dimensional hydraulic model |
url |
http://dx.doi.org/10.1088/1757-899x/615/1/012059 |
publishDate |
2019 |
physical |
012059 |
description |
<jats:title>Abstract</jats:title>
<jats:p>In this study the combined uncertainty of a two-dimensional (2D) hydraulic model expanded at 95% confidence level is estimated and the uncertainty budget for the model outputs is attempted to be constructed. It has been shown that many uncertainty sources in the inputs as well as the procedure applied have a significant impact on the accuracy of two-dimensional hydraulic modelling: the uncertainties in the model inputs due to variations in Manning’s ‘n’ Coefficient assigned, the bridge modelling methods, the equation sets; Diffusion Wave and Full Momentum Equations employed and the geometric data sets for the same river system in the Black Sea Region of Turkey are assessed. To estimate an appropriate M‘n’C and other model inputs of model for a river system with a wide 2D flow area is a daunting task. Therefore, any attempt to quantify uncertainties in the assigned values must be based on the samples large enough to obtain statistically significant results. To achieve this task, Monte Carlo Method is utilized to estimate the contribution of the likely variations of model inputs onto ‘the combined expended uncertainty at 95% confidence level in two-dimensional hydraulic modelling’.</jats:p> |
container_issue |
1 |
container_start_page |
0 |
container_title |
IOP Conference Series: Materials Science and Engineering |
container_volume |
615 |
format_de105 |
Article, E-Article |
format_de14 |
Article, E-Article |
format_de15 |
Article, E-Article |
format_de520 |
Article, E-Article |
format_de540 |
Article, E-Article |
format_dech1 |
Article, E-Article |
format_ded117 |
Article, E-Article |
format_degla1 |
E-Article |
format_del152 |
Buch |
format_del189 |
Article, E-Article |
format_dezi4 |
Article |
format_dezwi2 |
Article, E-Article |
format_finc |
Article, E-Article |
format_nrw |
Article, E-Article |
_version_ |
1792341789486612481 |
geogr_code |
not assigned |
last_indexed |
2024-03-01T16:25:23.39Z |
geogr_code_person |
not assigned |
openURL |
url_ver=Z39.88-2004&ctx_ver=Z39.88-2004&ctx_enc=info%3Aofi%2Fenc%3AUTF-8&rfr_id=info%3Asid%2Fvufind.svn.sourceforge.net%3Agenerator&rft.title=Constructing+uncertainty+budget+for+a+two-dimensional+hydraulic+model&rft.date=2019-10-01&genre=article&issn=1757-899X&volume=615&issue=1&pages=012059&jtitle=IOP+Conference+Series%3A+Materials+Science+and+Engineering&atitle=Constructing+uncertainty+budget+for+a+two-dimensional+hydraulic+model&aulast=G%C3%BCl&aufirst=U+S&rft_id=info%3Adoi%2F10.1088%2F1757-899x%2F615%2F1%2F012059&rft.language%5B0%5D=und |
SOLR | |
_version_ | 1792341789486612481 |
author | Ozbey, N, Gül, U S |
author_facet | Ozbey, N, Gül, U S, Ozbey, N, Gül, U S |
author_sort | ozbey, n |
container_issue | 1 |
container_start_page | 0 |
container_title | IOP Conference Series: Materials Science and Engineering |
container_volume | 615 |
description | <jats:title>Abstract</jats:title> <jats:p>In this study the combined uncertainty of a two-dimensional (2D) hydraulic model expanded at 95% confidence level is estimated and the uncertainty budget for the model outputs is attempted to be constructed. It has been shown that many uncertainty sources in the inputs as well as the procedure applied have a significant impact on the accuracy of two-dimensional hydraulic modelling: the uncertainties in the model inputs due to variations in Manning’s ‘n’ Coefficient assigned, the bridge modelling methods, the equation sets; Diffusion Wave and Full Momentum Equations employed and the geometric data sets for the same river system in the Black Sea Region of Turkey are assessed. To estimate an appropriate M‘n’C and other model inputs of model for a river system with a wide 2D flow area is a daunting task. Therefore, any attempt to quantify uncertainties in the assigned values must be based on the samples large enough to obtain statistically significant results. To achieve this task, Monte Carlo Method is utilized to estimate the contribution of the likely variations of model inputs onto ‘the combined expended uncertainty at 95% confidence level in two-dimensional hydraulic modelling’.</jats:p> |
doi_str_mv | 10.1088/1757-899x/615/1/012059 |
facet_avail | Online, Free |
format | ElectronicArticle |
format_de105 | Article, E-Article |
format_de14 | Article, E-Article |
format_de15 | Article, E-Article |
format_de520 | Article, E-Article |
format_de540 | Article, E-Article |
format_dech1 | Article, E-Article |
format_ded117 | Article, E-Article |
format_degla1 | E-Article |
format_del152 | Buch |
format_del189 | Article, E-Article |
format_dezi4 | Article |
format_dezwi2 | Article, E-Article |
format_finc | Article, E-Article |
format_nrw | Article, E-Article |
geogr_code | not assigned |
geogr_code_person | not assigned |
id | ai-49-aHR0cDovL2R4LmRvaS5vcmcvMTAuMTA4OC8xNzU3LTg5OXgvNjE1LzEvMDEyMDU5 |
imprint | IOP Publishing, 2019 |
imprint_str_mv | IOP Publishing, 2019 |
institution | DE-Bn3, DE-Brt1, DE-Zwi2, DE-D161, DE-Gla1, DE-Zi4, DE-15, DE-Pl11, DE-Rs1, DE-105, DE-14, DE-Ch1, DE-L229, DE-D275 |
issn | 1757-8981, 1757-899X |
issn_str_mv | 1757-8981, 1757-899X |
language | Undetermined |
last_indexed | 2024-03-01T16:25:23.39Z |
match_str | ozbey2019constructinguncertaintybudgetforatwodimensionalhydraulicmodel |
mega_collection | IOP Publishing (CrossRef) |
physical | 012059 |
publishDate | 2019 |
publishDateSort | 2019 |
publisher | IOP Publishing |
record_format | ai |
recordtype | ai |
series | IOP Conference Series: Materials Science and Engineering |
source_id | 49 |
spelling | Ozbey, N Gül, U S 1757-8981 1757-899X IOP Publishing http://dx.doi.org/10.1088/1757-899x/615/1/012059 <jats:title>Abstract</jats:title> <jats:p>In this study the combined uncertainty of a two-dimensional (2D) hydraulic model expanded at 95% confidence level is estimated and the uncertainty budget for the model outputs is attempted to be constructed. It has been shown that many uncertainty sources in the inputs as well as the procedure applied have a significant impact on the accuracy of two-dimensional hydraulic modelling: the uncertainties in the model inputs due to variations in Manning’s ‘n’ Coefficient assigned, the bridge modelling methods, the equation sets; Diffusion Wave and Full Momentum Equations employed and the geometric data sets for the same river system in the Black Sea Region of Turkey are assessed. To estimate an appropriate M‘n’C and other model inputs of model for a river system with a wide 2D flow area is a daunting task. Therefore, any attempt to quantify uncertainties in the assigned values must be based on the samples large enough to obtain statistically significant results. To achieve this task, Monte Carlo Method is utilized to estimate the contribution of the likely variations of model inputs onto ‘the combined expended uncertainty at 95% confidence level in two-dimensional hydraulic modelling’.</jats:p> Constructing uncertainty budget for a two-dimensional hydraulic model IOP Conference Series: Materials Science and Engineering |
spellingShingle | Ozbey, N, Gül, U S, IOP Conference Series: Materials Science and Engineering, Constructing uncertainty budget for a two-dimensional hydraulic model |
title | Constructing uncertainty budget for a two-dimensional hydraulic model |
title_full | Constructing uncertainty budget for a two-dimensional hydraulic model |
title_fullStr | Constructing uncertainty budget for a two-dimensional hydraulic model |
title_full_unstemmed | Constructing uncertainty budget for a two-dimensional hydraulic model |
title_short | Constructing uncertainty budget for a two-dimensional hydraulic model |
title_sort | constructing uncertainty budget for a two-dimensional hydraulic model |
title_unstemmed | Constructing uncertainty budget for a two-dimensional hydraulic model |
url | http://dx.doi.org/10.1088/1757-899x/615/1/012059 |