author_facet Setiawan, D
Milyardi, R
Ing, T L
Rizkiana, C
Setiawan, D
Milyardi, R
Ing, T L
Rizkiana, C
author Setiawan, D
Milyardi, R
Ing, T L
Rizkiana, C
spellingShingle Setiawan, D
Milyardi, R
Ing, T L
Rizkiana, C
IOP Conference Series: Materials Science and Engineering
Risk Allocation Model For Cisumdawu Toll Road Projects
General Medicine
author_sort setiawan, d
spelling Setiawan, D Milyardi, R Ing, T L Rizkiana, C 1757-8981 1757-899X IOP Publishing General Medicine http://dx.doi.org/10.1088/1757-899x/1071/1/012008 <jats:title>Abstract</jats:title> <jats:p>In the Cisumdawu Toll Road project there are some complex problems, including the first tunnel structure in Indonesia that functions as a toll road. This complex construction project is currently experiencing delays which creates risks for project delays. In this study the aim is to identify risks and create an optimal risk allocation model between the project owner and the contractor. The allocation of risk between project owner and contractor in a contract plays an important role for the success of the project. It should be based on a proper assessment of the involved risks and choosing the party best able to manage them. This research was obtained about risks that can be impacted by the project in each phase. The scope of non-excusable factors often is considered a contractor’s fault which results in project construction. Based on the results of descriptive test of the 5 main risks include the most important risk in the Cisumdawu Toll Road Construction Phase II (STA 9+750 – STA 27+100) is soil work. The results show that the soil work risk should bear by the contractors by lump sum fixed price contract.</jats:p> Risk Allocation Model For Cisumdawu Toll Road Projects IOP Conference Series: Materials Science and Engineering
doi_str_mv 10.1088/1757-899x/1071/1/012008
facet_avail Online
Free
format ElectronicArticle
fullrecord blob:ai-49-aHR0cDovL2R4LmRvaS5vcmcvMTAuMTA4OC8xNzU3LTg5OXgvMTA3MS8xLzAxMjAwOA
id ai-49-aHR0cDovL2R4LmRvaS5vcmcvMTAuMTA4OC8xNzU3LTg5OXgvMTA3MS8xLzAxMjAwOA
institution DE-Zwi2
DE-D161
DE-Gla1
DE-Zi4
DE-15
DE-Pl11
DE-Rs1
DE-105
DE-14
DE-Ch1
DE-L229
DE-D275
DE-Bn3
DE-Brt1
imprint IOP Publishing, 2021
imprint_str_mv IOP Publishing, 2021
issn 1757-8981
1757-899X
issn_str_mv 1757-8981
1757-899X
language Undetermined
mega_collection IOP Publishing (CrossRef)
match_str setiawan2021riskallocationmodelforcisumdawutollroadprojects
publishDateSort 2021
publisher IOP Publishing
recordtype ai
record_format ai
series IOP Conference Series: Materials Science and Engineering
source_id 49
title Risk Allocation Model For Cisumdawu Toll Road Projects
title_unstemmed Risk Allocation Model For Cisumdawu Toll Road Projects
title_full Risk Allocation Model For Cisumdawu Toll Road Projects
title_fullStr Risk Allocation Model For Cisumdawu Toll Road Projects
title_full_unstemmed Risk Allocation Model For Cisumdawu Toll Road Projects
title_short Risk Allocation Model For Cisumdawu Toll Road Projects
title_sort risk allocation model for cisumdawu toll road projects
topic General Medicine
url http://dx.doi.org/10.1088/1757-899x/1071/1/012008
publishDate 2021
physical 012008
description <jats:title>Abstract</jats:title> <jats:p>In the Cisumdawu Toll Road project there are some complex problems, including the first tunnel structure in Indonesia that functions as a toll road. This complex construction project is currently experiencing delays which creates risks for project delays. In this study the aim is to identify risks and create an optimal risk allocation model between the project owner and the contractor. The allocation of risk between project owner and contractor in a contract plays an important role for the success of the project. It should be based on a proper assessment of the involved risks and choosing the party best able to manage them. This research was obtained about risks that can be impacted by the project in each phase. The scope of non-excusable factors often is considered a contractor’s fault which results in project construction. Based on the results of descriptive test of the 5 main risks include the most important risk in the Cisumdawu Toll Road Construction Phase II (STA 9+750 – STA 27+100) is soil work. The results show that the soil work risk should bear by the contractors by lump sum fixed price contract.</jats:p>
container_issue 1
container_start_page 0
container_title IOP Conference Series: Materials Science and Engineering
container_volume 1071
format_de105 Article, E-Article
format_de14 Article, E-Article
format_de15 Article, E-Article
format_de520 Article, E-Article
format_de540 Article, E-Article
format_dech1 Article, E-Article
format_ded117 Article, E-Article
format_degla1 E-Article
format_del152 Buch
format_del189 Article, E-Article
format_dezi4 Article
format_dezwi2 Article, E-Article
format_finc Article, E-Article
format_nrw Article, E-Article
_version_ 1792328599030726660
geogr_code not assigned
last_indexed 2024-03-01T12:55:19.127Z
geogr_code_person not assigned
openURL url_ver=Z39.88-2004&ctx_ver=Z39.88-2004&ctx_enc=info%3Aofi%2Fenc%3AUTF-8&rfr_id=info%3Asid%2Fvufind.svn.sourceforge.net%3Agenerator&rft.title=Risk+Allocation+Model+For+Cisumdawu+Toll+Road+Projects&rft.date=2021-02-01&genre=article&issn=1757-899X&volume=1071&issue=1&pages=012008&jtitle=IOP+Conference+Series%3A+Materials+Science+and+Engineering&atitle=Risk+Allocation+Model+For+Cisumdawu+Toll+Road+Projects&aulast=Rizkiana&aufirst=C&rft_id=info%3Adoi%2F10.1088%2F1757-899x%2F1071%2F1%2F012008&rft.language%5B0%5D=und
SOLR
_version_ 1792328599030726660
author Setiawan, D, Milyardi, R, Ing, T L, Rizkiana, C
author_facet Setiawan, D, Milyardi, R, Ing, T L, Rizkiana, C, Setiawan, D, Milyardi, R, Ing, T L, Rizkiana, C
author_sort setiawan, d
container_issue 1
container_start_page 0
container_title IOP Conference Series: Materials Science and Engineering
container_volume 1071
description <jats:title>Abstract</jats:title> <jats:p>In the Cisumdawu Toll Road project there are some complex problems, including the first tunnel structure in Indonesia that functions as a toll road. This complex construction project is currently experiencing delays which creates risks for project delays. In this study the aim is to identify risks and create an optimal risk allocation model between the project owner and the contractor. The allocation of risk between project owner and contractor in a contract plays an important role for the success of the project. It should be based on a proper assessment of the involved risks and choosing the party best able to manage them. This research was obtained about risks that can be impacted by the project in each phase. The scope of non-excusable factors often is considered a contractor’s fault which results in project construction. Based on the results of descriptive test of the 5 main risks include the most important risk in the Cisumdawu Toll Road Construction Phase II (STA 9+750 – STA 27+100) is soil work. The results show that the soil work risk should bear by the contractors by lump sum fixed price contract.</jats:p>
doi_str_mv 10.1088/1757-899x/1071/1/012008
facet_avail Online, Free
format ElectronicArticle
format_de105 Article, E-Article
format_de14 Article, E-Article
format_de15 Article, E-Article
format_de520 Article, E-Article
format_de540 Article, E-Article
format_dech1 Article, E-Article
format_ded117 Article, E-Article
format_degla1 E-Article
format_del152 Buch
format_del189 Article, E-Article
format_dezi4 Article
format_dezwi2 Article, E-Article
format_finc Article, E-Article
format_nrw Article, E-Article
geogr_code not assigned
geogr_code_person not assigned
id ai-49-aHR0cDovL2R4LmRvaS5vcmcvMTAuMTA4OC8xNzU3LTg5OXgvMTA3MS8xLzAxMjAwOA
imprint IOP Publishing, 2021
imprint_str_mv IOP Publishing, 2021
institution DE-Zwi2, DE-D161, DE-Gla1, DE-Zi4, DE-15, DE-Pl11, DE-Rs1, DE-105, DE-14, DE-Ch1, DE-L229, DE-D275, DE-Bn3, DE-Brt1
issn 1757-8981, 1757-899X
issn_str_mv 1757-8981, 1757-899X
language Undetermined
last_indexed 2024-03-01T12:55:19.127Z
match_str setiawan2021riskallocationmodelforcisumdawutollroadprojects
mega_collection IOP Publishing (CrossRef)
physical 012008
publishDate 2021
publishDateSort 2021
publisher IOP Publishing
record_format ai
recordtype ai
series IOP Conference Series: Materials Science and Engineering
source_id 49
spelling Setiawan, D Milyardi, R Ing, T L Rizkiana, C 1757-8981 1757-899X IOP Publishing General Medicine http://dx.doi.org/10.1088/1757-899x/1071/1/012008 <jats:title>Abstract</jats:title> <jats:p>In the Cisumdawu Toll Road project there are some complex problems, including the first tunnel structure in Indonesia that functions as a toll road. This complex construction project is currently experiencing delays which creates risks for project delays. In this study the aim is to identify risks and create an optimal risk allocation model between the project owner and the contractor. The allocation of risk between project owner and contractor in a contract plays an important role for the success of the project. It should be based on a proper assessment of the involved risks and choosing the party best able to manage them. This research was obtained about risks that can be impacted by the project in each phase. The scope of non-excusable factors often is considered a contractor’s fault which results in project construction. Based on the results of descriptive test of the 5 main risks include the most important risk in the Cisumdawu Toll Road Construction Phase II (STA 9+750 – STA 27+100) is soil work. The results show that the soil work risk should bear by the contractors by lump sum fixed price contract.</jats:p> Risk Allocation Model For Cisumdawu Toll Road Projects IOP Conference Series: Materials Science and Engineering
spellingShingle Setiawan, D, Milyardi, R, Ing, T L, Rizkiana, C, IOP Conference Series: Materials Science and Engineering, Risk Allocation Model For Cisumdawu Toll Road Projects, General Medicine
title Risk Allocation Model For Cisumdawu Toll Road Projects
title_full Risk Allocation Model For Cisumdawu Toll Road Projects
title_fullStr Risk Allocation Model For Cisumdawu Toll Road Projects
title_full_unstemmed Risk Allocation Model For Cisumdawu Toll Road Projects
title_short Risk Allocation Model For Cisumdawu Toll Road Projects
title_sort risk allocation model for cisumdawu toll road projects
title_unstemmed Risk Allocation Model For Cisumdawu Toll Road Projects
topic General Medicine
url http://dx.doi.org/10.1088/1757-899x/1071/1/012008